莉莉学生公寓
使用产品:Komfort EC DB 350 MVHR Units
Komfort EC DB 350机组外形很薄,高于平均风速,并且能够以全速提供滴流、增压和通风。此外,F8过滤器还可以在保持低噪音水平的同时,降低繁华地段的空气污染。
Lillie House, Phase II – London Road – Leicester
Blauberg UK were awarded the contract to supply 100 Komfort EC DB 350 units for a student accommodation project in Leicester. We managed to overcome the tight delivery schedule of just four weeks to deliver the first 24 units and the remaining 76+ units were delivered just one week later.
The new build student development, which consists of around 100 units, uses a hot water design based around air source heat pumps and a central gas fired plant to allow the building to be electrically heated whilst still being compliant with Part L2A.
Komfort EC DB 350 units suited this project due to their slim profile, higher than average airflow rates and their ability to offer trickle, boost and purge ventilation at full speed. F8 filters are also included to reduce pollution levels from a busy road while maintaining low noise levels.
The project is currently on site, due for completion in 2017.
Architect – Acanthus WSM Architects
Consultant – Built Environment Consulting Ltd
Contractor – JA Ball